DESERT HORIZON · ABU DHABI, UAERobotics for your next move.

Multiway CMC05

Price on request

Lift-Top AMR. Designed for material movement in warehouses and production facilities.

New equipment supplied to order. Delivery is agreed and charged separately before dispatch.

Add to basket ↗
SKU: DH-MULTIWAY-CMC05 Category:

Description

What Multiway CMC05 is for

Automate lift-top transport as part of an engineered warehouse or production logistics workflow.

Lift-Top AMR. Designed for material movement in warehouses and production facilities.

Where it fits

  • Lifting and moving compatible carriers between configured stations
  • Connecting the agreed material-flow steps with dispatch or fleet software

Practical advantages

  • Can take over a defined, repetitive transport step once the route and handovers are validated.
  • Makes pickup and drop-off locations part of a planned material-flow process.
  • Can support coordinated scheduling with the wider warehouse system when integration is included.

Choose the right configuration

Carrier clearance, lift interface, payload stability and docking tolerances. Confirm navigation, traffic management, charging, WMS/WCS interfaces and commissioning. Throughput depends on the complete site layout and workflow, not the vehicle alone.

Discuss your project

Tell us your task, location in the UAE, required quantity and operating conditions. Desert Horizon will confirm the offered configuration, availability, warranty and support scope. Product prices are in AED; delivery is agreed and charged separately before dispatch.

Product reference information ↗

Plan a successful deployment

Document load dimensions, weight distribution and the pickup and drop-off interfaces. Observe the route during a representative shift, including crossings and temporary storage. Define dispatch signals, handover acknowledgement and a manual fallback. Commission one material-flow step first, measure completed cycles and intervention effort, then decide whether the process is ready for additional routes or vehicles.

For Multiway CMC05, use the configuration guidance above to prepare your project brief. Ask us to confirm the exact supplied equipment, integration responsibilities and acceptance scope.

Additional information

Manufacturer

Multiway

Reviews

There are no reviews yet.

Be the first to review “Multiway CMC05”

Your email address will not be published. Required fields are marked *